Stories

Browse major news stories and see what officials have said.

Tag: shipbuilding ✕

Trump Orders the Navy to Rip the Electromagnetic Catapults Out of the Next Ford-Class Carrier and Go Back to 1950s Steam — and the Navy Starts Studying Whether to Move the Island to Match His WWII Aesthetic

On August 13, 2026, President Trump signed a national security memorandum, "Rebuilding the United States Navy and America's Shipbuilding Industrial Base," directing Secretary of War Pete Hegseth and acting Navy Secretary Hung Cao to deliver a plan within 60 days to replace the Electromagnetic Aircraft Launch System (EMALS) and Advanced Weapons Elevators with steam catapults and hydraulic elevators on the future USS Doris Miller (CVN-81), a Ford-class carrier already under construction. The USS Gerald R. Ford, the future USS John F. Kennedy and the future USS Enterprise keep EMALS; the reversal starts with the fourth ship. The same memo opens the door to foreign-built warships and foreign ship designs — a direct conflict with House and Senate NDAA language restricting construction in foreign yards — and directs planning for a fifth public shipyard. Two days later, on August 15, The Washington Post reported that the Navy is separately studying whether to relocate the carrier "island" — the multistory command tower — from its aft position toward the middle of the ship, because Trump prefers the look of World War II-era carriers. The aft island placement was a deliberate design choice to free deck space near the catapults and reduce turbulence on landing. The Navy examined moving it during Trump's first term and concluded the cost and delay would be, in one former senior official's words, "extraordinary." EMALS production on CVN-81 is roughly 50 percent complete. General Atomics, the manufacturer, warned that "changing course now would introduce significant cost, schedule, and integration risks." Plans call for up to 10 Ford-class carriers over four decades at a projected $22 billion each. Sen. Mark Kelly (D-AZ) — a former Navy combat pilot with a master's in aeronautical engineering who sits on Armed Services — was the sharpest congressional voice against the order. Congress was in August recess, limiting on-record reaction.

“I've launched off the front of aircraft carriers hundreds of times, have a Master's degree in aeronautical engineering, and am a test pilot and even I wouldn't suggest to the Navy how to engineer specific systems on its ships.”

Mark Kelly (D-AZ) · Aug 15, 2026
defense
navy
shipbuilding
3 statements

CBO Puts Trump’s "Golden Fleet" of Trump-Class Battleships at $275 Billion — $23.4 Billion for the First Ship Alone — and the Senate’s Top Budget Democrat Says Congress Should Refuse to Fund It

On August 5, 2026, the Congressional Budget Office released an estimate, requested by Senate Budget Committee Ranking Member Jeff Merkley, of what President Trump's proposed new class of nuclear-powered battleships would cost. CBO put the 15-ship program at about $275 billion through 2056: roughly $23.4 billion for the lead ship, the future USS Defiant, and about $18 billion each for the 14 that would follow. If the design grows to 41,000 tons, CBO put the worst case at $528 billion. The Senate Budget Committee separately estimated that the 20-to-25-ship fleet Trump has described would run about $455 billion. Trump announced the "Golden Fleet" at Mar-a-Lago on December 22, 2025, alongside Defense Secretary Pete Hegseth and Navy Secretary John Phelan, describing a battleship armed with hypersonic missiles, nuclear-armed sea-launched cruise missiles, an electromagnetic railgun and high-powered lasers — several of which remain undeveloped. It would be the largest U.S. surface combatant since World War II. CBO cautioned that its numbers are "highly uncertain," resting on assessments of a design that does not yet exist, and questioned whether American shipyards have the capacity to build nuclear-powered vessels of this size at all. The Navy has asked for roughly $1 billion in advance procurement and about $837 million in research and development in fiscal 2027, with a planned $17 billion request for the first ship's procurement in fiscal 2028 — which is where the fight over whether the fleet gets built will land.

“While American families can’t even keep their heads above water, Donald Trump is spending his time building himself a “Golden Fleet” of battleships the Navy doesn’t want.”

Chuck Schumer (D-NY) · Aug 6, 2026
navy
pentagon
defense-spending
6 statements